Starting the new bathroom (Sep/07)

After a summer break we’ve turned our attention back to the house. Our current project is the bathroom. So far, we have put in a fan, a bathroom regulations light, a frosted window and we have had the room plastered. Now we need to tile the floor, buy the bathroom suite and do the plumbing.

One response to “Starting the new bathroom (Sep/07)”

  1. Our Bathroom Tile

    Tile Over Tile: Radiant Heated Bathroom Floor…

    Tile over tile means exactly what it says, but in this case you’re going to sandwich a layer of radiant heating mats between the old and the new tile. Tile over tile is an easy way to avoid the mess associated with tearing up the old bathroom floor, b…

Leave a Reply