Upstairs is finished (Aug/08)
At last the upstairs is finished, two bedrooms, a bathroom and now, the stairs. Before: After: Now, all that’s left is the dining room.
Perfectly sized “Powered by Ubuntu” Sticker (18/Aug/08)
If you have a Laptop with a small circular power button (e.g. a Sony VGN-AR51E) the stickers in issue 110 of Linux format magazine seem to be perfectly sized to frame it if you cut a hole in the middle of the Ubuntu logo. Of course, the other thing you have to do is peel […]
Swimming through Durdle Door
James, David, and I did an exhilarating swim from Man O’ War beach to Durdle Door beach through the archway. The “door” at Durdle Door, Swanage. Knackered after the 20 min swim
Finished the Bathroom (Aug/08)
The bathroom turned out to be quite difficult to get right because of drainage issues and in the end we had to raise the floor up to hide pipes and to get a better slope for waste water. It’ll be nice having a on-suite bathroom, no more going downstairs to clean our teeth. Before: After: