Progress with the new bathroom (Jan/07)

We’re raising the floor to get a better fall on the waste pipe.
  • Under floor plumbing will hide all the pipes.
  • We’re converting the radiator into a towel rail.
The new floor is nice and solid (25mm Ply)
The Bath is now fitted and ready. We chose quite a clever design: no taps and a shower hose that doesn’t hang in the bath.
We put down Ditra matting because we’re tiling – It’ll waterproof the floor and allow for the natural movement of the wood.

Leave a Reply