Random Post: Count Zero (William Gibson)
RSS .92| RSS 2.0| ATOM 0.3
  • About Me
  • Me@work
  • Kix
  • My CV - Oct/08
  • Hundreds of Short Quotes
  • Archives
  •  

    Progress with the new bathroom (Jan/07)

    We’re raising the floor to get a better fall on the waste pipe.
    • Under floor plumbing will hide all the pipes.
    • We’re converting the radiator into a towel rail.
    The new floor is nice and solid (25mm Ply)
    The Bath is now fitted and ready. We chose quite a clever design: no taps and a shower hose that doesn’t hang in the bath.
    We put down Ditra matting because we’re tiling - It’ll waterproof the floor and allow for the natural movement of the wood.

    Leave a Reply